Redistribute Project Costs
OBJECTIVE
The Redistribute Project Costs option redistributes the income or expenses from a master project to its sub-projects. This function is helpful when transactions are entered into the master project and must then be distributed to related sub-projects.
This option is available in the following options:
PREREQUISITEs
- Configuration – Projects (Complete the Cost Redistribution section)
- Project Management
Summary
The same screen is used to create cost redistribution templates which can then be used to generate cost redistribution transactions.
Steps
Creating Cost Redistribution Templates for Projects
- Access one of the options in which this function is available.
- Click the Redistribute Project Costs icon.
- Enter the required information in the header section:
This section lets you specify the settings to be used for each project for which a redistribution of costs is required.
Distribution templates that have already been entered are displayed at the top of the screen.
Field
Description
Master Project*
Code of the master project from which the transactions to be redistributed are from.
Type*
Types of transactions to be redistributed to the sub-projects.
The two possible values include: Expense or Income.
The default type is: Expense.
Activities to be redistributed**
Used to identify the source activities containing amounts to be redistributed to the sub-projects.
NOTE: Formula example: 1000-5000,-4000. This formula redistributes activities with codes between 1000 and 5000, and excludes activity 4000.
Activity to credit**
Activity in the master project to which a credit amount will be posted based on the total value redistributed to sub-projects.
Group to credit**
Group in the master project to which a credit amount will be posted based on the total value redistributed to sub-projects.
Activity to debit**
Activity in sub-projects to which a debit amount will be posted based on the total value redistributed to each of the sub-projects.
Group to debit**
Group in sub-projects to which a debit amount will be posted based on the total value redistributed to each of the sub-projects.
Description
Description of the cost redistribution. This description will be included in the redistribution transaction that will be created.
Quantity to redistribute
Total quantity to be redistributed among the sub-projects.
NOTE: The quantity in the header to be redistributed must match the total quantities distributed among the sub-projects in the breakdown grid. To divide this amount equally among all of the sub-projects, click the Recalculate Table icon in the tool bar.
Fields followed by the * character are mandatory fields.
**IMPORTANT NOTE: If no value is entered in these fields, the system will, by default, use the settings specified in Configuration - Projects, Cost Redistribution section. If no information is found in these fields, the system uses the activities and groups in the original transactions read in the master project.
- Sub-project section: This section displays the sub-projects and their descriptions.
Field
Description
Quantity
Quantity to be applied to the sub-project, in relation to the total quantity to be distributed among the sub-projects, entered in the Quantity to be Redistributed field in the header.
NOTE: The quantity in the header to be redistributed must match the total quantities distributed among the sub-projects in the breakdown grid. The redistribution may be equal between each of the sub-projects or may vary from one to another.
Example 1: A simple way to distribute the cost equally among four sub-projects is to enter 4 as the Quantity to Be Redistributed in the header and to enter 1 in each sub-project in the Quantity in the Grid column.
Example 1: To indicate a specific percentage to be distributed to each sub-project, enter 100 as the Quantity to be Redistributed and enter the percentage to be redistributed to each sub-project in the Quantity in the Grid column.
- Click Save.
- You can create a new redistribution template by selecting the template be copied in the Summary of non-transferred Transactions section and clicking the Save a New Cost Redistribution icon. Repeat steps 1 to 4.
Redistributing Project Costs
- From the Redistribute Project Costs option:
- Select a redistribution template in the Summary of non-transferred Transactions.
- Complete the Transaction Redistribution section.
- Transaction Redistribution section:
Field
Description
Start date
Start date for the transactions to be redistributed.
End Date
End date for the transactions to be redistributed.
Transfer Date
Posting date of the transfer.
- Click Accept.
The system will compile the transactions entered in the master project based on selected dates. It will then distribute the costs or income to each of the sub-projects based on the quantity entered on each line.
A transaction is created and the master project and sub-projects will be assigned.
This transaction will be available in the Project-to-Project Transfer option pending transfer.