maestro* > Purchasing > Purchasing > Purchase Order > Stock Order from Catalogue |
Modification made when creating orders with an extension to eliminate the error message obtained when, following the first save of the new order created with extension, the order remains displayed on the screen, a value is changed in the breakdown grid, and a second save is performed. |
maestro* > Purchasing > Purchasing > Procurement > Procurement Management (MRP 1) |
Improvement made to take into account Locations for inventory quantities per item when the site to be processed is a Master Site. In the detail window, Inventory section, quantities will be displayed separately for each location with inventory-site managed items. In the Requisitions section, a new Source - Location column has been added, allowing the display or selection of the location to take into account when generating transactions. |
![]() |
maestro* > Equipment > Equipment Allocation > Processing > Equipment Allocation |
Modification made to the equipment allocation suspension so as not to affect its in-stock and available quantities in the various companies (prefixes). Applicable to the multidimensional mode only. |
![]() |
maestro* > Service Management > Service Management > Invoicing > Invoicing |
Modification made to keep all properties of a detail line when copy-pasting this line to a new line in the breakdown grid. |
![]() |
maestro*MOBILE > Field Work Orders |
Modification made to be able to enter regular, overtime, and/or double time in a single time entry, as it is possible to do in the Project interface, and have the system enter this information in the correct fields of the Work Order option in maestro*. |